Project Name : El Mek Nimir Bridge Construction
Project Location : Khartoum SUDAN
Starting Date : Jan 2006
Completion Date : Oct 2007
Number of operating cranes : 2
Started in 2006, mobil cranes operated at the
construction of the 1161 meters long, 22 meter wide
bridge built on the blue nile river which goes in
between the two sides of Khartoum. 120 tonner and 50
tonner cranes completed the steel construction
activities of the brigde within the 22 months. |