Project Name : İzmir Adnan Menderes Airport
International Terminal Construction
Project Location : İzmir
Starting Date : Oct 2005
Completion Date : Nov 2006
Number of operating cranes : 7
Mobil Cranes from 30 tonner to 200 tonner have acted
a major role during the assembly of the critical
parts from the foundation to the roof of the İzmir
Adnan Menderes Airport International Terminal.
Furthermore, the most critical part of the assembly
was the 22 meter diametered steel roof part of the
45 meter height control tower. LIEBHERR LTM 1160
rigged with the luffing jib has successfully
completed the lifting.
|