Project Name : ÇOLAKOĞLU METALURJİ A.Ş Iron-Steel
Factory
Project Location : Dilovası Gebze
Starting Date : Nov 2005
Completion Date : July 2007
Number of operating crane : 7
Our mobil and crawler cranes operated during the new
extension and the renovation phases of COLAKOĞLU
Metalurji. The coloums which are 40 meters long and
weights 120 tons were erected with LIEBHERR LR 1250,
250 tonner crawler crane as the main crane and with
LIEBHERR LR 1200, 200 tonner crawler crane as the
tail crane. In addition, our cranes from 50 ton upto
220 ton were operated for the steel construction
inside the factory. |