CERÇELİK A.Ş – Çelikhane Montajı

Project Name : CERÇELİK A.Ş Iron-Steel Factory Construction
Project Location : Pınarbaşı- İZMİR
Starting Date : Nov 2005
Completion Date : July 2007
Number of operated cranes : 3

Some filters, units, etc of the Iron-Steel factory, located in İzmir-Pınarbaşı, owned by CERCELIK, were assembled by our fleet crane LTM 1160 mobil crane equipped with luffing jib. During the critical lifting of the operation, the crane was rigged with 33 meters main boom with 35 meters luffing jib and lifted 11 tons successfully to the radius of 32 meters.