Project Name : EREN ENERGY – Power Plant Assembly –
Port Construction
Project Location : Çatalağzı - Zonguldak
Starting Date : Aug 2007
Completion Date : Still going on
Number of Operating Cranes : 10
The operation is still gong on in pilling, power
plant assembly and port construction facilities of
the 1360 MW coal-fired power plant established in
Çatalağzı Zonguldak by Eren Energy, a company
belongs to Eren Holding of Turkey. 2 pcs 180 tonner
Sennebogen 5500 and 1 Demag cc 600 – 140 tonner
crawler crane have worked in the piling job for one
year. In addition, both crawler and mobil cranes
from 100 to 200 tonner capacity have worked on the
assembly of the power plant. Still Liebherr LR 1200
– 200 tonner crawler and American 7260 – 110 tonner
crawler are working on the port construction of that
power plant. |