EREN ENERJİ A.Ş. - Power Plant Construction – Marine Works

Project Name : EREN ENERGY – Power Plant Assembly – Port Construction
Project Location : Çatalağzı - Zonguldak
Starting Date : Aug 2007
Completion Date : Still going on
Number of Operating Cranes : 10

The operation is still gong on in pilling, power plant assembly and port construction facilities of the 1360 MW coal-fired power plant established in Çatalağzı Zonguldak by Eren Energy, a company belongs to Eren Holding of Turkey. 2 pcs 180 tonner Sennebogen 5500 and 1 Demag cc 600 – 140 tonner crawler crane have worked in the piling job for one year. In addition, both crawler and mobil cranes from 100 to 200 tonner capacity have worked on the assembly of the power plant. Still Liebherr LR 1200 – 200 tonner crawler and American 7260 – 110 tonner crawler are working on the port construction of that power plant.